Kaua‘i weekly lane closures: Sept. 14-19
Hawai‘i Department of Transportation announced lane closures for Sept. 14-19.
Lane closure schedules may change at any time without further notice. All projects are weather permitting. A map of lane closures can be found here: https://hidot.hawaii.gov/highways/roadwork/.
— KAUMUALI‘I HIGHWAY (ROUTE 50) —
PUA LOKE
Right lane closure on Kaumuali‘i Highway (Route 50) possible in either direction, between mile post 0.5 to 1.0 in the vicinity of Uahi Road and Cane Road, from Sept. 15 to Sept. 19 from 8:30 a.m. to 1:30 p.m. for restriping crosswalks.
KIPU TO OMAO (WEEKEND/NIGHT WORK)
Roving lane closure on Kaumuali‘i Highway (Route 50) possible in either direction, between mile post 2.9 to 8.7 in the vicinity of Kipu Road and Omao Road, from 9 p.m., Sept. 14 to 5 a.m., Sept. 15 for striping.
LAWAI
Lane shift on Kaumuali‘i Highway (Route 50) possible in either direction, between mile post 9.9 to 10.3 in the vicinity of Akemama Road and Kōloa Road, on Sept. 15 to Sept. 19 from 8:30 a.m. to 1:30 p.m. for installation of new reflectors.
KALĀHEO TO ‘ELE‘ELE
Right lane closure on Kaumuali‘i Highway (Route 50) possible in either direction, between mile post 12.2 to 15.4 in the vicinity of Halewili Road and Laulea Street, on Sept. 15 to Sept. 19 from 8:30 a.m. to 1:30 p.m. for cutting grass.
— KŪHIŌ HIGHWAY (ROUTES 56/560) —
LĪHU‘E TO ANAHOLA (NIGHT WORK)
Roving right lane closure on Kūhiō Highway (Route 56) possible in either direction, between mile post 0.0 to 13, in the vicinity of Rice Street and Kukuihale Road, on Sept. 16 to Sept. 18 from 1 a.m. to 6:30 a.m. for street sweeping.
KAPA‘A (WEEKEND/NIGHT WORK)
Single lane closure on Kūhiō Highway (Route 56) possible in either direction, between mile post 8 to 9.5, in the vicinity of Akia Road, on Sept. 14 to Sept. 15 from 9 p.m. to 5 a.m. for striping and marking installation. Alternating traffic will be routed through the open lane.
KAPA‘A
Single lane closure on Kūhiō Highway (Route 56) possible in either direction, between mile post 8 to 9.5, in the vicinity of Akia Road, on Sept. 15 to Sept. 19 from 8:30 a.m. to 3:30 p.m. for striping and marking installation. Alternating traffic will be routed through the open lane.
KĪLAUEA
Single lane closure on Kūhiō Highway (Route 56) possible in either direction, near mile post 23.3, in the vicinity of Kalamania Road, on Sept. 15 to Sept. 19 from 8:30 a.m. to 3:30 p.m. for drain line and roadway work. Alternating traffic will be routed through the open lane.
KALIHIWAI TO PRINCEVILLE (WEEKEND/NIGHT/DAILY WORK)
Single lane closure as needed on Kūhiō Highway (Route 56) possible in either direction, between mile post 24.4 to 28.1, in the vicinity of Kahiliholo Road to Emmalani Drive, on Sept. 15 to Sept. 19 from 8 a.m. to 3 p.m. for rumble strip installation and striping.
HANALEI
Single lane closure on Kūhiō Highway (Route 560) in the Haena-bound direction between mile post 1.2 to 4.2, in the vicinity of Ohiki Road, on Sept. 15 to Sept. 19 from 8:30 a.m. to 3:30 p.m. for paving, concrete work and guardrail installation. Alternating traffic will be routed through the open lane.
WAIKOKO (24/7 CLOSURE)
Single lane closure on Kūhiō Highway (Route 560) possible in either direction between mile post 4.3 to 4.5, in the vicinity of Waikoko Bridge and Lumahai Trailhead, 24 hours a day, 7 days a week, for slope stabilization of Waikoko Hillside. Traffic signal will control alternating traffic through the open lane. Details: https://hidot.hawaii.gov/highways/24-hour-single-lane-closure-on-kuhio-highway-in-waikoko/
— WAIMEA CANYON DRIVE (ROUTE 550) —
KŌKE‘E
Single lane closure on Waimea Canyon Drive (Route 550) possible in either direction between mile post 4.6 to 11.5, on Sept. 15 to Sept. 19 from 7 a.m. to 5:30 p.m. for shoulder reconstruction. Alternating traffic will be routed through the open lane.
— KAPA‘A BYPASS ROAD (ROUTE 5600) —
WAILUA TO KAPA‘A
Right lane closure on Kapa‘a Bypass Road (Route 5600) possible in either direction between mile post 0.7 to 3, in the vicinity of Olohena Road and Kūhiō Highway on Sept. 15 to Sept. 19 from 8:30 a.m. to 1:30 p.m. for cutting grass along guardrails and slopes.