Hawai‘i Department of Transportation announces the following lane closures and road work projects for state roadways on the Garden Isle during the week of Aug. 3-8.
Photo File
HIGHWAY 50
PUA LOKE
SHOULDER CLOSURE in the southbound direction between mile posts 0.51 and 0.56, in the vicinity of Uahi Road, from 8:30 a.m. to 3:30 p.m. Aug. 6-8 for waterline tie in.
LĪHU‘E TO PUHI
ROVING LANE CLOSURE possible in either direction between mile posts 2.9 and 8.7, in the vicinity of Kīpū Road and ʻŌmaʻo Road, from 8:30 a.m. to 1:30 p.m. Aug. 4-8 for maintaining crosswalks.
KĪPŪ TO ʻŌMAʻO
ROVING LANE CLOSURE possible in either direction between mile posts 2.9 and 8.7, in the vicinity of Kīpū Road and ʻŌmaʻo Road, from 9 p.m. to 5 a.m. Aug. 3-8 for striping.
KŌLOA
SINGLE LANE CLOSURE possible in either direction between mile posts 4 and 6.7, in the vicinity of Puuana Road and Maluhia Road, from 9 p.m. to 5 a.m. Aug. 3-8 for soil boring.
HIGHWAY 51
LĪHU‘E
RIGHT LANE CLOSURE in the northbound direction between mile posts 1.6 and 1.9, in the vicinity of Kāʻana Street and Ahukini Road, 24 hours 7 days a week from Aug. 4 to Sept. 1 for sewer line installation.
ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD
NĀWILIWILI
TWO-LANE CLOSURE possible in either direction between mile posts 0.0 and 0.09, in the vicinity of Waʻa-pā Road, from 8:30 a.m. to 1:30 p.m. Aug. 4-8 for gutter and shoulder clearing.
HIGHWAYS 56/560
LĪHU‘E
RIGHT LANE CLOSURE possible in either direction between mile posts 2 and 4, in the vicinity of Hanamāʻulu Road and Kauaʻi Beach Road, from 1 to 6:30 a.m. Aug. 5-7for cutting grass.
WAILUĀ
TWO-LANE CLOSURE possible in either direction between mile posts 5.6 and 5.9, in the vicinity of Wailuā Bridge, from 9 p.m. to 5 a.m. Aug. 4-8 for bridge repair. There will be one lane of traffic open in both directions.
KAPAʻA
SINGLE LANE CLOSURE possible in either direction between mile posts 8 and 9.5, in the vicinity of ʻAkia Road, from 9 p.m. to 5 a.m. Aug. 3-8 for striping and marking installation. Alternating traffic will be routed through the open lane.
KĪLAUEA
SINGLE LANE CLOSURE possible in either direction between mile posts 20.5 and 22, in the vicinity of Koʻolau Road and Kaluamakua Place, from 8:30 a.m. to 3:30 p.m. Aug. 6 for guardrail repair.
ADVERTISEMENT
KALIHIWAI TO PRINCEVILLE
SINGLE LANE CLOSURE possible in either direction between mile posts 24.4 and 28.1, in the vicinity of Kāhiliholo Road to Emmalani Drive, from 8 p.m. to 4:30 a.m. Aug. 3-8 for rumble strip installation and striping.
PRINCEVILLE TO HANALEI
SINGLE LANE CLOUSRE possible in either direction between mile posts 0.3 and 1.2, in the vicinity of Hanalei Plantation Road and ʻŌhiki Road, from 8 p.m. to 5:30 a.m. Aug. 4-8 for asphalt reconstruction. Alternating traffic will be routed through the open lane.
HANALEI
RIGHT LANE CLOSURE possible in either direction between mile posts 2 and 3.5, in the vicinity of Kumu Road, from 8:30 a.m. to 3:30 p.m. Aug. 4-8 for clearing of inlets and outlets.
SINGLE LANE CLOSURE in the Hāʻena-bound direction between mile posts 2.7 and 3.3 (Tahiti Nui and ʻAnae Road) from 8:30 a.m. to 3:30 p.m. Aug. 4-8 for paving and concrete work. Alternating traffic will be routed through the open lane.
WAIKOKO TO HALEHOMAHA
RIGHT LANE CLOSURE possible in either direction between mile posts 4 and 9, in the vicinity of Waipā Stream and ʻĀleʻaleʻa Road, from 8:30 a.m. to 1:30 p.m. Aug. 4-8 for cutting grass.
WAIKOKO
SINGLE LANE CLOSURE possible in either direction between mile posts 4.3 and 4.5, in the vicinity of Waikoko Bridge and Lumahaʻi Trailhead, 24 hours a day, 7 days a week, for slope stabilization of Waikoko Hillside. Traffic signal will control alternating traffic through the open lane. Details: Click here.
HIGHWAY 540
ARTICLE CONTINUES BELOW AD
WAHIAWĀ
RIGHT LANE CLOSURE possible in either direction between mile posts 2 and 3, in the vicinity of McBride New Mill Road and Camp 2, from 8:30 a.m. to 1:30 p.m. Aug. 4-8 for fire break maintenance.
HIGHWAY 550
KŌKE‘E
SINGLE LANE CLOSURE possible in either direction between mile posts 4.6 and 11.5 from 7 a.m. to 3:30 p.m. Aug. 4-8 for installation of best management practices, grubbing and clearing. Alternating traffic will be routed through the open lane.
HIGHWAY 580
WAILUĀ HOMESTEADS
RIGHT LANE CLOSURE possible in either direction in the vicinity of mile post 4.8 from 8:30 a.m. to 3:30 p.m. Aug. 4-5 for guardrail repair.
Lane closure schedules can change at any time without notice. All projects are weather permitting.
Stay in-the-know with dailyheadlines delivered straight to your inbox.
×
Comments
This comments section is a public community forum for the purpose of free expression. Although Kauai Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments