19 lane closures scheduled during week of Feb. 15-20 on Kaua‘i state roadways
Hawai‘i Department of Transportation announces the following 19 scheduled lane closures and road work projects on Kaua‘i state roadways during the week of Feb. 15-20.
Note: In observance of Presidents’ Day on Feb. 16, there will be no contraflow or lane closures unless otherwise permitted.
* * * * * * * * *

HIGHWAY 50
KŌLOA TO ʻŌMAʻO
- SINGLE LANE CLOSURE possible in either direction, between mile posts 6.6 and 8.4 in the vicinity of Maluhia Road and Puneʻe Road, from midnight to 5:30 a.m. Feb. 17 for cutting grass.
ʻŌMAʻO
- SINGLE LANE CLOSURE possible in either direction, between mile posts 8.46 and 9.3 in the vicinity of Puneʻe Road and Piko Road, from midnight to 5:30 a.m. Feb. 19 for trimming grass.
LĀWAʻI
- SINGLE LANE CLOSURE possible in either direction, between mile posts 9.6 and 11.3 in the vicinity of Piko Road and Kōloa Road, from midnight to 5 a.m. Feb. 18 for trimming grass.
HANAPĒPĒ TO MAKAWELI
- SINGLE LANE CLOSURE in the southbound direction, between mile posts 17 and 20.6 in the vicinity of Lele Road and Private Road, from Feb. 17-20 for fire break work.
HIGHWAY 51
NĀWILIWILI
- SINGLE LANE CLOSURE possible in either direction, between mile posts 0.1 and 0.7 in the vicinity of Lala Road and Mōkoi Street, from 8:30 p.m. to 5 a.m. Feb. 17-20 for asphalt reconstruction. Alternating traffic will be routed through the open lane.
HIGHWAYS 56/560
LĪHU‘E
- CENTER LANE CLOSURE in both directions, between mile posts 0.1 and 0.3 in the vicinity of Hardy Street and Poinciana Street, from 9 p.m. to 5 a.m. Feb. 17-20 for waterline replacement. No left turns will be allowed through the work area. DETAILS: Click here.
- SINGLE LANE CLOSURE in the southbound direction, between mile posts 4.2 and 4.9 in the vicinity of Wailuā Golf Course, from 1 to 6:30 a.m. Feb. 17-19 for cutting grass.
WAILUĀ
- FULL CLOSURE in the southbound direction on Wailuā River Mauka Bridge, between mile posts 5.7 and 5.9 in the vicinity of Wailuā Marina Road and Kuamoʻo Road, from 9 p.m. to 5 a.m. Feb. 17-20 for concrete work on Wailuā River Mauka Bridge. Traffic will be routed to the Wailuā River Plantation Bridge. DETAILS: Click here.
ANAHOLA TO MOLOAʻA
- LANE SHIFT possible in either direction, between mile posts 14 and 16 in the vicinity of ʻAliomanu Road, from 8:30 a.m. to 1:30 p.m. Feb. 17-20 for cutting grass.
KALIHIWAI TO PRINCEVILLE
- LANE SHIFT possible in either direction, between mile posts 24.4 and 28.1 in the vicinity of Kāhiliholo Road to Emmalani Drive, from 8 p.m. to 5 a.m. Feb. 15-20 for striping.
PRINCEVILLE
- FULL CLOSURE, between mile posts 0.3 and 1.2 in the vicinity of Hanalei Plantation Road and ʻŌhiki Road, from 11 p.m. to 5 a.m. Feb. 17-20 for paving. DETAILS: Click here.
- SINGLE LANE CLOSURE in the southbound direction, between mile posts 0.4 and 1 in the vicinity of Hanalei Plantation Road and ʻŌhiki Road, from 8:30 a.m. to 2:30 p.m. Feb. 17-18 for tree trimming.
- SINGLE LANE CLOSURE in the southbound direction, between mile posts 1 and 1.1 in the vicinity of Hanalei Plantation Road and ʻŌhiki Road, from 8:30 a.m. to 2:30 p.m. Feb. 17-18 for tree trimming.
WAIKOKO
- SINGLE LANE CLOSURE possible in either direction, between mile posts 4.6 and 4.8 in the vicinity of Waikoko Bridge and Lumahaʻi Beach, from 8:30 a.m. to 4:30 p.m. Feb. 16 for installation of anchored wire mesh. Alternating traffic will be routed through the open lane.
HIGHWAY 58
PUA LOKE
- INTERSECTION CLOSED at Nāwiliwili Road and Kukui Grove Street in the northbound direction, between mile posts 1.9 and 2, from 9 p.m. to 5 a.m. Feb. 17-20 for underground survey work for future installation of sewer and waterlines. Traffic will be detoured to Haleko Road. DETAILS: Click here.
- RIGHT TURN POCKET CLOSURE in the northbound direction, near mile post 2 in the vicinity of Kaumualiʻi Highway, from 9 p.m. to 5 a.m. Feb. 17-20 for installation of underground utilities.
HIGHWAY 550
KŌKE‘E
- FULL CLOSURE, between mile posts 0.0 and 1.1 in the vicinity of Kaumualiʻi Highway and Panini Place, from 8 p.m. to 5 a.m. Feb. 17-20 for pavement reconstruction.
- SINGLE LANE CLOSURE possible in either direction, between mile posts 4.6 and 11.5, from 7 a.m. to 5:30 p.m. Feb. 17-20 for shoulder reconstruction. Alternating traffic will be routed through the open lane.
HIGHWAY 580
WAILUĀ HOMESTEADS
- SINGLE LANE CLOSURE in the northbound direction, between mile posts 0.0 and 4.5 in the vicinity of Kūhiō Highway and ʻĀina Pono Street, from 8:30 a.m. to 1:30 p.m. Feb. 17-20 for cutting the grass.
* * * * * * * * *
Lane closure schedules can change at any time without notice. All projects are weather permitting.
A map of lane closures can be found online.
