Kauai News

9 lane closures scheduled during week of Jan. 24-30 on Kaua‘i state roadways

Play
Listen to this Article
2 minutes
Loading Audio... Article will play after ad...
Playing in :00
A
A
A

Hawai‘i Department of Transportation announces the following 9 scheduled lane closures and road work projects on Kaua‘i state roadways during the week of Jan. 24-30.

* * * * * * * * *

Image File

HIGHWAY 50

KĪPŪ TO ʻŌMAʻO

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 2.9 and 8.4 in the vicinity of Kīpū Road and Puneʻe Road, from 9 p.m. to 5 a.m. Jan. 25-30 for rumble strip and striping work. Traffic will be routed through the open lane.

HIGHWAYS 56/560

LĪHU‘E

  • CENTER LANE CLOSURE in both directions, between mile posts 0.1 and 0.3 in the vicinity of Hardy Street and Poinciana Street, from 9 p.m. to 5 a.m. Jan. 15-30 for waterline replacement. No left turns will be allowed through the work area. More details: Click here.

WAILUĀ

  • FULL CLOSURE in the southbound direction on Wailuā Mauka Bridge, between mile posts 5.7 and 5.9 in the vicinity of Wailuā State Park Road and Kuamoʻo Road, from 9 p.m. to 5 a.m. Jan. 26-30 for concrete work on the Wailuā Mauka Bridge. Traffic will be routed to the Wailuā Plantation Bridge. More details: Click here.
ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD

KALIHIWAI TO PRINCEVILLE

  • LANE SHIFT possible in either direction, between mile posts 24.4 and 28.1 in the vicinity of Kāhiliholo Road to Emmalani Drive, from 8 p.m. to 5 a.m. Jan. 25-30 for striping.

HANALEI

  • SINGE LANE CLOSURE possible in either direction, between mile posts 1.2 and 2.4 in the vicinity of ʻŌhiki Road and Papio Place, from 8:30 a.m. to 3:30 p.m. Jan. 26-30 for guardrail installation. Alternating traffic will be routed through the open lane.
  • SINGLE LANE CLOSURE possible in either direction, between mile posts 2.6 and 3.3 in the vicinity of Aku Road and ʻAnae Road, from 8:30 a.m. to 3:30 p.m. Jan. 26-30 for concrete work. Alternating traffic will be routed through the open lane.

WAIKOKO

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 4.6 and 4.8 in the vicinity of Waikoko Bridge and Lumahaʻi Beach, from 8:30 a.m. to 4:30 p.m. Jan. 26-30 for soil nail drilling, grouting and concrete work. Alternating traffic will be routed through the open lane.

HIGHWAY 550

ADVERTISEMENT

KŌKE‘E

  • FULL CLOSURE between mile posts 1.1 and 6.7, in the vicinity of Panini Place and Kōkeʻe Road, from 8 a.m. to 3:30 p.m. Jan. 26-30 for pavement reconstruction and resurfacing. Traffic will be detoured to Kōkeʻe Road. More details: Click here.
  • SINGLE LANE CLOSURE between mile posts 4.6 and 11.5 from 7 a.m. to 5:30 p.m. Jan. 26-30 for shoulder reconstruction. Alternating traffic will be routed through the open lane.

* * * * * * * * *

Lane closure schedules can change at any time without notice. All projects are weather permitting.

A map of lane closures can be found online.

ARTICLE CONTINUES BELOW AD

Sponsored Content

Subscribe to our Newsletter

Stay in-the-know with daily
headlines delivered straight to your inbox.
Cancel
×

Comments

This comments section is a public community forum for the purpose of free expression. Although Kauai Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments