Hawai‘i Department of Transportation announces the following 9 scheduled lane closures and road work projects on Kaua‘i state roadways during the week of Jan. 24-30.
* * * * * * * * *
Image File
HIGHWAY 50
KĪPŪ TO ʻŌMAʻO
SINGLE LANE CLOSURE possible in either direction, between mile posts 2.9 and 8.4 in the vicinity of Kīpū Road and Puneʻe Road, from 9 p.m. to 5 a.m. Jan. 25-30 for rumble strip and striping work. Traffic will be routed through the open lane.
HIGHWAYS 56/560
LĪHU‘E
CENTER LANE CLOSURE in both directions, between mile posts 0.1 and 0.3 in the vicinity of Hardy Street and Poinciana Street, from 9 p.m. to 5 a.m. Jan. 15-30 for waterline replacement. No left turns will be allowed through the work area. More details: Click here.
WAILUĀ
FULL CLOSURE in the southbound direction on Wailuā Mauka Bridge, between mile posts 5.7 and 5.9 in the vicinity of Wailuā State Park Road and Kuamoʻo Road, from 9 p.m. to 5 a.m. Jan. 26-30 for concrete work on the Wailuā Mauka Bridge. Traffic will be routed to the Wailuā Plantation Bridge. More details: Click here.
ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD
KALIHIWAI TO PRINCEVILLE
LANE SHIFT possible in either direction, between mile posts 24.4 and 28.1 in the vicinity of Kāhiliholo Road to Emmalani Drive, from 8 p.m. to 5 a.m. Jan. 25-30 for striping.
HANALEI
SINGE LANE CLOSURE possible in either direction, between mile posts 1.2 and 2.4 in the vicinity of ʻŌhiki Road and Papio Place, from 8:30 a.m. to 3:30 p.m. Jan. 26-30 for guardrail installation. Alternating traffic will be routed through the open lane.
SINGLE LANE CLOSURE possible in either direction, between mile posts 2.6 and 3.3 in the vicinity of Aku Road and ʻAnae Road, from 8:30 a.m. to 3:30 p.m. Jan. 26-30 for concrete work. Alternating traffic will be routed through the open lane.
WAIKOKO
SINGLE LANE CLOSURE possible in either direction, between mile posts 4.6 and 4.8 in the vicinity of Waikoko Bridge and Lumahaʻi Beach, from 8:30 a.m. to 4:30 p.m. Jan. 26-30 for soil nail drilling, grouting and concrete work. Alternating traffic will be routed through the open lane.
HIGHWAY 550
ADVERTISEMENT
KŌKE‘E
FULL CLOSURE between mile posts 1.1 and 6.7, in the vicinity of Panini Place and Kōkeʻe Road, from 8 a.m. to 3:30 p.m. Jan. 26-30 for pavement reconstruction and resurfacing. Traffic will be detoured to Kōkeʻe Road. More details: Click here.
SINGLE LANE CLOSURE between mile posts 4.6 and 11.5 from 7 a.m. to 5:30 p.m. Jan. 26-30 for shoulder reconstruction. Alternating traffic will be routed through the open lane.
* * * * * * * * *
Lane closure schedules can change at any time without notice. All projects are weather permitting.
Stay in-the-know with dailyheadlines delivered straight to your inbox.
×
Comments
This comments section is a public community forum for the purpose of free expression. Although Kauai Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments